By Paul Homewood
h/t Joe Public
This is an absolute disaster for Miliband’s floating windfarm target:
https://x.com/adissentient/status/1840690466477535685, which generated
.
Kincardine produced 144 GWh last year, so the total cost equates to £562/MWh.
They have a PPA in place which generated £13.3m at £92/MWh. On top of that ROC subsidies worked out at £217/MWh